The VDC discipline
Where BIM creates the model, VDC manages the people, workflows and technology around it. Our goal is to identify and resolve every potential field issue in a high-fidelity virtual environment before mobilization.
Our coordination workflows
- Automated clash detection — hard interferences and soft clearances
- Interdisciplinary coordination sessions that replace paper-based RFIs
- Active conflict resolution — rerouting MEP services and adjusting elevations
- 4D construction sequencing linked to the master schedule
Beyond simple 3D
VDC unlocks Integrated Concurrent Engineering, virtual mock-ups for complex spaces, and site logistics planning — all in the model before a crane is mobilized.
The four pillars of our VDC framework
- Integrated Concurrent Engineering (ICE) — high-intensity sessions where architects, ASMEPF engineers and contractors resolve issues in real time, slashing RFI wait time
- Virtual mock-ups & prototyping — validate aesthetics, clearances and buildability for guestrooms, plant rooms and complex structural nodes before installation
- Digital fabrication & prefabrication — shop-ready data drives off-site assembly of modular MEP skids and fire-protection manifolds
- Site logistics & safety simulation — crane placement, material staging and safety zones planned virtually so heavy ASMEPF installs never disrupt the rest of the site
The business value of VDC for ASMEPF
- Schedule & cost predictability — risks identified before they become financial liabilities
- Reduced on-site labor & waste — prefabrication shifts hours from the field to the factory
- Enhanced quality & handover — VDC keeps information intact from design through LOD 500
BIM vs. VDC — product and process
| Dimension | BIM (the product) | VDC (the process) |
|---|---|---|
| Primary goal | Create a data-rich 3D model | Use the model to meet schedule and budget |
| Focus | Geometry and information | People, collaboration and workflow |
| Deliverable | The digital twin | The built facility, delivered with certainty |
| ASMEPF role | Identifies where a pipe is located | Determines when and how that pipe is installed |
Your project is engineered for buildability — a seamless transition from the digital screen to the physical site.
Related insights
All servicesClash Detection & Mitigation
Identify and resolve every spatial and temporal interference across ASMEPF systems in the virtual environment — before they reach the field.
Read moreConflict-Free Construction
Resolve every spatial, logical and sequencing conflict in the model so the site team installs instead of improvising — and change orders stop draining your budget.
Read moreDelivery & Handover
Translate months of digital engineering into a structured as-built model and an operational digital twin owners can rely on for decades.
Read more